[Jul-2021] Get 100% Real NCS-Core Exam Questions, Accurate & Verified ActualPDF Dumps in the Real Exam! [Q109-Q132]

Share

[Jul-2021] Get 100% Real NCS-Core Exam Questions, Accurate & Verified ActualPDF Dumps in the Real Exam!

Pass Your NCS Professional Exams Fast. All Top NCS-Core Exam Questions Are Covered.

NEW QUESTION 109
After imaging the nodes and creating the cluster successfully, the consultant connects the cluster to the customer network. When logging into Prism, the events dashboard is full of errors.
What is causing the issue?

  • A. Foundation did not create the cluster successfully.
  • B. The consultant did not run Nutanix Cluster Check (NCC..
  • C. The cluster was not stopped prior to connecting to the customer network.
  • D. The Cluster Virtual IP Address (VIP) was not set up during the process.

Answer: C

 

NEW QUESTION 110
A customer has a Nutanix cluster with 10Gb connectivity via switch fabric extenders. The administrator receives NCC health check errors of latency greater than 200ms.
Which action should the administrator take to resolve the NCC errors?

  • A. Add 2 additional 10G uplinks from the switch fabric extendersper node
  • B. Upgrade NCC and increase the CVM memory by 4Gb
  • C. Upgrade NCC and increase the vCPU of the CVM
  • D. Replace the switch fabric extenders with 10G line rate switches

Answer: D

Explanation:
Explanation
Ref:https://portal.nutanix.com/page/documents/details?targetId=System-Specs-G6-Single-Node:set-block-conne

 

NEW QUESTION 111
A customer has an ESXi Cluster with two 10GbE NICs on each node with the following requirements:
* Solution must follow Nutanix Best Practices
* Network configuration should be redundant
* A vSphere Standard Switch must be utilized
Which load balancing method should be used?

  • A. Route based on originating port ID
  • B. Route based on source MAC hash
  • C. Route based on physical NIC load
  • D. Route based on IP hash

Answer: A

 

NEW QUESTION 112
A company needs to replicate their VMs to a remote site and must have an RPO of less than 1 hour.
When creating a protection domain, what should an administrator do to meet this requirement?

  • A. Enable Entity Sync on the designated VMs
  • B. Enable Availability Zones and send the VM to multiple targets
  • C. Enable Near-Sync Replication with an RPO of 15 minutes
  • D. Enable Async Replication with an RPO of 60 minutes

Answer: D

Explanation:
Explanation
Ref:https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v5_10:sto-pd-guidel

 

NEW QUESTION 113
After installation, network ports are properly configured with the default active-backup bonding.
One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.
What should the consultant enable to resolve this issue?

  • A. LACP on switch
  • B. PAgP
  • C. Jumbo frames
  • D. Portfast

Answer: D

 

NEW QUESTION 114
An administrator receives an error indicating that the CVMs in the cluster are not syncing to any NTP servers.
An investigation of the issue finds:
* The NTP servers are configured in Prism
* The time on all CVMs is the same
* Both the CVMs and AHV hosts are configured for the UTC time zone
Which two steps can be taken to troubleshoot this issue? (Choose two.)

  • A. Confirm that the NTP servers are reachable from the CVMs.
  • B. Restart genesis on all CVMs.
  • C. Restart the chronosservice on all CVMs.
  • D. On a CVM. run the command a Hash ntpq -pn.

Answer: A,D

Explanation:
Explanation
Ref:https://portal.nutanix.com/page/documents/kbs/details?targetId=kA032000000bmjeCAA#Review_ntpq

 

NEW QUESTION 115
While trying to upgrade AOS in a cluster, a consultant receives a warning message that there are two powered-on VMs that need to be powered off for the upgrade to proceed.
What would cause this warning to be issued?

  • A. Upgrading a single-node cluster requires the VMs to be shut down.
  • B. There are not enough resources left in the two-node cluster.
  • C. Upgrading a two-node cluster requires the VMs to be shut down.
  • D. There are not enough resources left in the single-node cluster.

Answer: A

 

NEW QUESTION 116
An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned.
How should the administrator perform this task?

  • A. Check the Disregard Existing Nodes radio button in the Runway scenario.
  • B. Add up the recovered workloads and manually remove from the Runway configuration.
  • C. Check the Disregard Existing Workloads radio button in the Runway scenario.
  • D. Power down the workloads during a maintenance window and run the Capacity Runway.

Answer: C

 

NEW QUESTION 117
An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.
A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.
Which step should the administrator use to initiate the project?

  • A. Convert storage only nodes into vSphere nodes
  • B. Enable Nutanix Flow at the Prism Central Level
  • C. Manually disable CVM network Segmentation
  • D. Enable Jumbo Frames to accommodate network frames

Answer: D

 

NEW QUESTION 118
A customer has engaged a Nutanix consultant to deploy a cluster consisting of two NX-3460-G6 blocks. The consultant arrives at the customer site and fines the following:
* One rack with a total of 5U available
* Two ToR switches with 14 total available ports
* Dual PDUs with six available sockets
What will prevent the consultant from successfully installing the cluster?

  • A. Insufficient network ports for communication.
    Insufficient sockets for power allocation.
  • B. Insufficient network ports for communication.
    Insufficient sockets for power allocation.
  • C. Insufficient rack space for block installation.
    Insufficient sockets for power allocation.
  • D. Insufficient sockets for power allocation.
    Rack space may not be continuous.
  • E. Insufficient network ports for communication.
    Rack space may not be continuous.

Answer: C

 

NEW QUESTION 119
An administrator needs to initiate a new VDI project within a couple of months. Prism Central reports there are no storage resources to accommodate such workloads.
The administrator sees many powered-off VMs and has the authority to delete test VMs powered off at least for 30 days. Test VMs belong to the Test category.
Using Prism Central, which steps are required to identify the correct VMs tobe deleted?

  • A. Filter VMs list, choose Test category and Inactive under Efficiency
  • B. Use Capacity Runway to filter by Test and Powered-off VMs
  • C. Create a new Scenario selecting Test VMs. filter by uptime
  • D. Create a new Project selecting Test VMs,sorting by power state

Answer: A

Explanation:

 

NEW QUESTION 120
Refer to the exhibit.

A consultant is installing AOS 5.10 and ESXi 6.5 on three nodes. During the Foundation process, ESXi 6.5 is not available as one of the choices for hypervisor.
Which solution should the consultant use?

  • A. Update the Foundation whitelist from the support portal.
  • B. Upload ESXi image to /home/Nutanix/foundation/nos/hypervisor/esx.
  • C. Upload ESXi image to /home/Nutanix/foundation/isos/hypervisor/esx.
  • D. Restart Foundation VM and refresh Foundation page.

Answer: C

 

NEW QUESTION 121
A customer buys ultimate licensing and wants to use the built-in Nutanix software encryption on their new AHV cluster. The customer needs to create three storage containers and asks the consultant to complete the process as fast as possible.
In which order should the cluster be deployed?

  • A. Create Cluster -> Install License Key -> Create Storage Containers -> Encrypt Cluster
  • B. Create Cluster -> Create Storage Containers -> Encrypt Cluster -> Install License Key
  • C. Create Cluster -> Encrypt Cluster -> Install License Key -> Create Storage Containers
  • D. Create Cluster -> Install License Key -> Encrypt Cluster -> Create Storage Containers

Answer: A

 

NEW QUESTION 122
In a 20-node ESXi deployment, the customer needs additional resiliency to survive the loss of two nodes concurrently.
Which configuration should the consultant use to ensure that the appropriate resources are available?

  • A. Storage reservation for 5%; HA admission control for 5%, cluster RF2
  • B. Storage reservation for 10%; HA admission control for 10%, cluster RF2
  • C. Storage reservation for 10%; HA admission control for 10%, cluster RF3
  • D. Storage reservation for 5%; HA admission control for 5%, cluster RF3

Answer: C

 

NEW QUESTION 123
A consultant is installing Nutanix AOS on Cisco UCS.
Which method should be used to install AOS on UCS hardware platforms?

  • A. Foundation Central
  • B. Foundation VM
  • C. Foundation Applet
  • D. Foundation as a Service

Answer: B

 

NEW QUESTION 124
A customer has a four-node cluster and is using Volume Groups toprovide storage services to a SQL cluster.
In the event of a CVM failure in the cluster, what is the expected IO path of the volume group's iSCSI targets?

  • A. vDisk directed to CVM that failed to disconnect and will not reconnect without manual intervention
  • B. vDisk directed at failure CVM are redirected to Data Services IP until CVM is reconnected
  • C. vDisk directed at failed CVM will disconnect and reconnect when thefailed CVM comes back online
  • D. vDisk directed to failed CVM are redirected to another CVM and automatically reconnect

Answer: D

 

NEW QUESTION 125
In a Nutanix cluster, a Protection Domain contains 50 entities that are replicated to a remote Single Node Replication Target.
The current schedule configuration is as follows:
* Repeat every 6 hours
* Local Retention Policy 1
* Remote Retention Policy 8
* Starting time 12 am
At 8 am on Monday, the administrator discovers that a protected VM is corrupted. The latest good state was Sunday 2 pm. The administrator needs to maintain current protection.
Which strategy should the administrator use to meet these requirements?

  • A. From the local site, retrieve the correct remote snapshot, then restore the VM locally.
  • B. From the local site, restore the VM from the local snapshot by selecting the correct snapshot.
  • C. From the Remote site, restore the VM from the local snapshot by selecting the correct snapshot
  • D. From the Remote site, activate the Protection Domain, then re-protect the entity.

Answer: A

 

NEW QUESTION 126
Where can a consultant find Nutanix Enablement Starter Packs (ESPs)?

  • A. In the Services section of the Nutanix website.
  • B. In the Support Portal
  • C. In the Partner Portal
  • D. In the Nutanix .NEXT Community Forum

Answer: C

 

NEW QUESTION 127
A consultant creates a Nutanix cluster using the 10.10.10.0/24 network and VLAN 10. The customer creates a VM network inside the Prism using VLAN 20. The customer starts to create VMs but is unable to ping the default gateway from these new systems.
What is causing the issue?

  • A. Only one VLAN is supported on AHV.
  • B. The CVM/hypervisor must be on an untagged VLAN.
  • C. The switch port is not set up as a trunk.
  • D. The CVM/hypervisor cannot use the same VLAN as guest VMs.

Answer: C

 

NEW QUESTION 128
A CEO asks the IT administrator to provide a list of required resources to protect current workloads and the two new SQL servers from a disaster. The Nutanix environment is managed by Prism Central.
Which option explains how to meet the CEO's request?

  • A. Create a new project and assign theVMs to it to get compute and storage requirements.
  • B. Create a new Recovery policy by selecting the VM that needs to be protected and get hardwarerequirements.
  • C. Create a new scenario based on a new cluster based on a VM Profile and select Recommend.
  • D. In Capacity Runway, select Optimize Resources and select all VMs that must be protected.

Answer: B

 

NEW QUESTION 129
An administrator inherits a new Nutanix environment and logs in to a CVM to check the network configuration. The configuration is as follows:

Which action should the administrator take to improve network performance?

  • A. Remove one 10 Gbs interface from br0-up to make sure all 10 Gbs can be used.
  • B. Configure VLAN tagging both on br0 and br1 and their physical interfaces.
  • C. Add eth0 and eth1 to the br0-up bond
  • D. Configure balance-sib or balance-tcp mode for br0-up if switch configuration allows

Answer: D

 

NEW QUESTION 130
An administrator is implementing a VDI solution. The workload will be a series of persistent desktops in a dedicated storage container withina four-node cluster. Storage optimizations should be set on the dedicated storage container to give optimal performance including during a node failure event.
Which storage optimizations should the administrator set to meet the requirements?

  • A. Compression only
  • B. Compression and Deduplication
  • C. Compression, Deduplication, and Erasure Coding
  • D. Deduplication and Erasure Coding

Answer: D

Explanation:
Explanation
Ref:

 

NEW QUESTION 131
An administrator is configuring an All Flash cluster to support the following workloads:
* Full clone virtual desktops
* Hadoop
* Write heavy databases
Whichthree correct configuration options should the administrator use to meet the item requirements? (Choose three.) For each procedure, indicate whether it is a correct or incorrect procedure that must be configured to meet the item requirements using the drop-down option.

Answer:

Explanation:

Explanation

Ref:

 

NEW QUESTION 132
......

Penetration testers simulate NCS-Core exam: https://www.actualpdf.com/NCS-Core_exam-dumps.html

Free Test Engine For Nutanix Certified Services Core Infrastructure Professional Certification Exams: https://drive.google.com/open?id=12BTyocIegzSZoE8Q76Emc--ZOsRLBIBC