NEW QUESTION # 20
= Total Downtime (hours) ÷ Number of Downtime Events
- A. Total Effective Equipment Performance (TEEP) Formula
- B. Maintenance Training ROI Formula
- C. Total Units Produced
- D. Mean Downtime (MDT) Formula
Answer: D
NEW QUESTION # 21
Time when the asset is scheduled to run divided by total available time expressed as a percentage. → UTILIZATION TIME
- A. True
- B. False
Answer: A
NEW QUESTION # 22
Of the choices below, which is the best way to evaluate the effectiveness of a Safety Program?
- A. Periodic safety audits of work processes in the field
- B. Solicit feedback about safety performance from employees
- C. Measure the number of safety slogans and bulletins posted
- D. Review health and safety performance as required
Answer: A
NEW QUESTION # 23
The act of restoring the function of an asset after failure or imminent failure by repairing or replacing the asset. Failure When
- A. Repair/Replacement Event
- B. A rule of thumb is that, on average, an experienced planner can plan work for how many craft people?
- C. Maintenance Unit Cost
- D. Maintenance Training Hours
Answer: A
NEW QUESTION # 24
Stocked MRO Inventory Value per RAV (%) = [Stocked MRO Value ($) × 100] ÷ Replacement Asset Value ($)
- A. Stocked MRO Inventory Value As a Percent of Replacement Value (RAV) Formula
- B. Scheduled Downtime
- C. Mean Time To Repair or Replace (MTTR) Formula
- D. Which of the following is not a primary objective for implementing a planning process?
Answer: A
NEW QUESTION # 25
An event when the asset is down and not capable of performing its intended function. → Downtime Event
- A. True
- B. False
Answer: B
NEW QUESTION # 26
Which ofthe following answers is not a critical factor in identifying customer requirements in developing a Maintenance and Reliability Program?
- A. Identify and prioritize requirements
- B. Validate customer requirements
- C. Establish standard operating procedures
- D. Define customer needs
Answer: C
NEW QUESTION # 27
What aspect of improving reliability is most often overlooked?
- A. Assessing the impact of change on the workforce
- B. Development of employee skills in root cause analysis
- C. Application of state-of-the-art condition monitoring technologies
- D. Computerized Maintenance Management System (CMMS) functionality
Answer: A
NEW QUESTION # 28
This metric is the ratio of the number of systems in a facility for which a criticality analysis has been performed divided by the total number of systems in the facility, expressed as a percentage. → Systems Covered by Criticality Analysis
- A. True
- B. False
Answer: A
NEW QUESTION # 29
Which of the following best measures the effectiveness of the Maintenance and Reliability workforce?
- A. The amount of backlog work
- B. Man-hours of Maintenance and Reliability work performed by production
- C. A set of key performance indicators
- D. Trends in the Maintenance and Reliability budget
Answer: C
NEW QUESTION # 30
When deciding if you should keep a part in stock, which of the following should be yourprimaryconcern?
- A. Is the equipment it fits on the critical equipment list?
- B. Is the store's inventory too high?
- C. Does the manufacturer suggest stocking it?
- D. Would plant (facility) output be affected?
Answer: D
NEW QUESTION # 31
True
- A. Maintenance Training Cost (per employee) Formula
- B. Most of the maintenance costs become fixed at what phase?
- C. Lagging KPIs are the results of a process. (T/F)
- D. The failure rate of a component/asset can be calculated by knowing:
Answer: C
NEW QUESTION # 32
False
- A. The "F" on the P-F interval indicates that equipment is still functioning. (T/F)
- B. Operations and Maintenance must work as a team to achieve improved OEE. (T/F)
- C. The best method of measuring the reliability of an asset is by counting downtime events. (T/F)
- D. The P-F interval can be applied to visual inspections. (T/F
Answer: A
NEW QUESTION # 33
Time when the asset is scheduled to run divided by total available time expressed as a percentage.
- A. Quality
- B. Preventive Maintenance Cost
- C. Performance Efficiency
- D. UTILIZATION TIME
Answer: D
NEW QUESTION # 34
The metric is a measure of equipment or asset performance based on actual availability, performance efficiency, and quality of product or output when the asset is scheduled to operate
- A. Preventive Maintenance Hours
- B. Overall Equipment Effectiveness (OEE)
- C. Mean Time Between Maintenance (MTBM)
- D. Mean Time To Repair or Replace (MTTR)
Answer: B
NEW QUESTION # 35
Which of the following is least likely to be linked to Maintenance and Reliability process improvements?
- A. Better availability capability
- B. Lower operating costs
- C. Improved product design
- D. Reduced rework
Answer: B
NEW QUESTION # 36
Motor Circuit Analysis (MCrA) on a low (450-600) voltage 3 Phase motor reveals significantly higher capacitance-to-ground than baseline values. Resistance-to-ground readings are good. What does this indicate and/or what should you do?
- A. Remove motor-from service and send to shop to be cleaned, dried, dipped and baked, since this is the surest way to corrective problem.
- B. No problem exists. Take no action.
- C. The motor contains abnormally high moistureand/or conductive contamination. Continue normal operation, but plan follow-on MCrA readings and possible corrective action.
- D. Do not start the motor. An "explosive" shorting condition could cause near instantaneous winding failure.
Answer: C
NEW QUESTION # 37
O&M
- A. It should be common practice for operators to perform PMs. (T/F)
- B. A rule of thumb is that, on average, an experienced planner can plan work for how many
- C. Which phase of the asset life cycle has the highest cost?
- D. TPM is a type of maintenance performed by the operators. (T/F)
- E. craft people?
Answer: E
NEW QUESTION # 38
Which one of the followingwork order characteristics addthe most value to the business?
- A. Proper authorization
- B. Work completed is well-documented
- C. Correct charge codes used
- D. Closed in a timely manner
Answer: B
NEW QUESTION # 39
the average time needed to restore an asset to its full operational capabilities after a failure, a measure of asset maintainability, usually expressed as the probability that a machine can be restored to its specified operable condition within a specified interval of time, regardless of whether an asset is repaired or replaced
- A. Mean Time To Repair or Replace (MTTR)
- B. Mean Time Between Maintenance (MTBM) Formula
- C. Replacement Asset Value (RAV)
- D. Mean Time To Repair or Replace (MTTR) Formula
Answer: A
NEW QUESTION # 40
Return on Assets (ROA) is determined by:
- A. Net income/Total assets
- B. Revenue/Total assets
- C. Net income/Maintenance costs
- D. Gross income/Total assets
Answer: A
NEW QUESTION # 41
......