NEW QUESTION # 73
Which of the following is the least productive way to gain employee ownership in a maintenance or reliability task?
- A. Ask the employee to attend a Maintenance and Reliability conference to obtain buy-in
- B. Allow the employee to develop programs on assets that have die largest impact on the organization, according to their experience
- C. Ask the employee to develop programs on assets identifiedas critical, and validate with them
- D. Assign the work with details about how, where, and when it is to be done
Answer: D
NEW QUESTION # 74
Mean Time Between Maintenance (MTBM) = Operating Time (hours) / Number of Maintenance Actions
- A. Operational Availability Formula
- B. Condition Based Maintenance Cost Formula
- C. Mean Time Between Maintenance (MTBM) Formula
- D. Preventive Maintenance Hours Formula
Answer: C
NEW QUESTION # 75
Total Maintenance Cost per RAV (%) = [Total Maintenance Cost ($) ×
100] ÷ Replacement Asset Value ($) → Total Maintenance Cost As a Percent of Replacement Asset Value (RAV)
- A. True
- B. False
Answer: B
NEW QUESTION # 76
A typical quantity produced as output. The output has acceptable quality and consistent means to quantify. Examples would include gallons, liters, pounds, kilograms or other standard units of measures. → Standard Units Produced
- A. False
- B. True
Answer: B
NEW QUESTION # 77
As the maintenance manager at a new plant (facility) you are developing the maintenance workforce strategy for start-up. Select the best workforce attributes for maximum effectiveness, assuming that unit labor costs are equal
- A. Operations performing minor maintenance and company multi-skilled technicians performing complex maintenance tasks.
- B. A managing contractor is brought on site to handle all aspects and provision of maintenance labor.
- C. An annual bid and selection of a maintenance labor contractor is performed, using unit-costing of tasks normally required.
- D. Multi skilled mechanical crafts (trades) and instrument electrical crafts (trades) are hired and developed.
Answer: A
NEW QUESTION # 78
the percentage of total maintenance labor hours used to restore equipment to a functional state after a failure or when failure is imminent → Corrective Maintenance Cost
- A. Ture
- B. False
Answer: B
NEW QUESTION # 79
You are new to the job of maintenance manager. As you start reviewing the work done by your five planners you find that, on average, they are dividing their time as follows:
5% Interviewing area personnel to scope out jobs
2% Creating pipe sketches and other small drawings
9% Ordering materials through the Computerized Maintenance Management System (CMMS)
5% Creating work order estimates
15% Researching what spare parts are needed and where to find them
25% Expediting materials that have not come in yet
5% Creating material kits for future jobs and maintaining the kitting area
1% Creating formal job steps in the work order record in the CMMS
10% Checking on field progress of the larger jobs
15% Talking with mechanics to explain the details of work they are to perform
8% Closing work orders and other data clean up tasks in the CMMS
In which two areas should you concentrate onto make the planners more productive?
- A. Increase the planning horizon and improve the quality of bills of material in the computerized maintenance and materials system
- B. Improve their communication skills through training and train all planners on proper estimation methods
- C. Encourage the planners to create more detailed job instructions in the work order record and hire another designer draftsman
- D. Eliminate the practice of job materials kitting or staging and purchase a different computerized maintenance and materials system
Answer: C
NEW QUESTION # 80
A plant (facility) has acquired three new screw pumps to replace centrifugal pumps. Within two months of installation it is found the seals have deteriorated allowing the release of hazardous chemicals into the work place. Which of the following is the best step that the maintenance or reliability leader could have taken to prevent this failure from occurring?
- A. Assured an experienced maintenance representative worked on the design review of the pumps
- B. Participated in the development of manufacturer's standards for screw pumps and seal designs
- C. Ensured the project provided an enclosure to contain fluids in the event of a seal leak
- D. Reviewed and selected manufacturer's to bid on the screw pumps based on their past performance
Answer: A
NEW QUESTION # 81
In developing a business plan for a maintenance and reliability improvement initiative it is important that the:
- A. business plan is entered into the Computerized Maintenance Management System and understood by the controller.
- B. plant manager leads the planning effort to develop the business plan so that ithas credibility and gains buy-in.
- C. business plan is a formal document that is linked to the corporate business objectives and operating goals and other initiatives.
- D. business plan outlines a payback on investment of between 1- 1/2 years and2- 1/4 years, with metrics totrack.
Answer: C
NEW QUESTION # 82
Using predictive technologies, approximately what percent of failures in rotating equipment can be found?
- A. 20%
- B. 60%
- C. 40%
- D. 80%
Answer: D
NEW QUESTION # 83
Two common reliability specifications to include in purchase orders for equipment are:
- A. Guaranteed Uptime (GU) and Guaranteed Downtime (GD).
- B. Mean Time Between Repair (\1TBR) and Guaranteed Availability (GA).
- C. Mean Time Between Failures (MTBF) and Mean Time To Repair (MTTR).
- D. Availability (A) and Maximum Required Outage Time (MROT).
Answer: C
NEW QUESTION # 84
The metric is the number of hours of formal training that maintenance personnel receive annually. It is expressed as hours per employee
- A. Maintenance Training Hours
- B. Maintenance Unit Cost Formula
- C. Performance Efficiency
- D. Preventive Maintenance Cost
Answer: A
NEW QUESTION # 85
Which of the following should be considered when designing for maintainability?
- A. Location of eyewash stations near hazardous chemical handling areas
- B. Total cost of ownership for new equipment
- C. Accessibility for component assembly disassembly
- D. Pressure and flow ratings of safety relief valves
Answer: C
NEW QUESTION # 86
The amount of time an asset is idle or waiting to run. It is the sum of the times when there is no demand, feedstock or raw material and other administrative idle time (e.g. not scheduled for production).
- A. Inherent Availability
- B. mean metrics
- C. Corrective Maintenance Hours
- D. Idle Time
Answer: D
NEW QUESTION # 87
During design
- A. Most of the maintenance costs become fixed at what phase?
- B. The objective of RCM is to preserve functions. (T/F)
- C. RCM provides best results when used during what phase?
- D. Which of the following is not a primary objective for implementing a planning process?
Answer: A
NEW QUESTION # 88
average availability over a specific time period when an asset is available for use. It is also called mean availability
- A. Maintenance Unit Cost
- B. Average Availability
- C. Lagging Indicator
- D. Actual Production Rate
Answer: B
NEW QUESTION # 89
Which of the following is not a typical element of a performance agreement between maintenance and operations?
- A. Machine availability targets
- B. Agreed upon staffing levels
- C. Repair response time targets
- D. Call-out procedures and guidelines
Answer: A
NEW QUESTION # 90
When a sale is designated FOB shipping point, who owns the merchandise while it is in transit?
- A. None of the above
- B. The shipping company
- C. The purchaser
- D. The seller
Answer: C
Explanation:
When a sale is designated FOB (free on board) shipping point,
the purchaser owns the merchandise while it is in transit FOB shipping point means that the purchaser assumes ownership and becomes responsible for shipping costs when the merchandise is picked up from the seller. Therefore, while it is in transit, the purchaser is considered to own the merchandise.
NEW QUESTION # 91
As the maintenance manager for a manufacturing company, you have conducted a study that reveals the mechanics, on average, spend four hours per ten hour shift on wrench time (tool turning time). Your first action should be:
- A. Inform management that four hours wrench time (tool turning time) per day is considered good.
- B. Improve planning and scheduling to increase wrench time (tool turning time).
- C. Investigate the barriers causing loss of wrench time (tool turning time).
- D. Encourage your planners to develop more aggressive job estimates.
Answer: C
NEW QUESTION # 92
total quantity of production produced in the given time period, regardless of its quality
- A. Actual Production
- B. Best Production Rate
- C. CRITICAL ANALYSIS
- D. Actual Production Rate
Answer: A
NEW QUESTION # 93
......