NEW QUESTION 23
If tunnel APS is configured for the tunnel to which the PW belongs, PW APS cannot be configured for the PW.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 24
The length range of the DATA field in the Ethernet frame structure is ().

  • A. 46-1500 bytes
  • B. 64-1500 bytes
  • C. 64-1518 bytes
  • D. 46-1518 bytes

Answer: A

 

NEW QUESTION 25
What are the prerequisites for creating a bidirectional MPLS tunnel? (Multiple Choice)

  • A. Port properties have been configured correctly
  • B. Users have network administrator user rights of "Administrators" and above
  • C. The LSR ID of each NE is correctly configured.
  • D. Determine the bandwidth of the MPLS Tunnel

Answer: A,B,C,D

 

NEW QUESTION 26
When creating new NE,which of the following Configuration Mode can be selected?

  • A. Initialize and Manually Configure NE Data
  • B. Upload
  • C. Copy NE Data
  • D. Download

Answer: D

 

NEW QUESTION 27
Two PIU/APIU boards use the hot backup mode to supply power to the system on the OSN 1800 device, when a PIU/APIU board fails, the system can still work normally.

  • A. TRUE
  • B. FALSE

Answer: A

 

NEW QUESTION 28
When the NNI port attribute is configured on the same subnet, the IP addresses of the ports on different links can be duplicated.

  • A. TRUE
  • B. FALSE

Answer: A

 

NEW QUESTION 29
Which of the following description are wrong about the path method to create a Client path?

  • A. Select the "Activate" checkbox. After the path is successfully created, it will be delivered to the NE layer. Otherwise, the path configuration text will only be saved on the network management side.
  • B. If the route to be automatically calculated is different from the planned path, you can set the "constrained node" or "must pass through the node" to perform routing constraints.
  • C. Create a client service path by using the path method. After the creation, the optical layer OCh path is automatically generated to reduce the secondary teaching of the path creation.
  • D. The creation or search of a new path must be possible if its upper service layer path already exists.

Answer: C

 

NEW QUESTION 30
When many alarms are reported at the same time, the alarm handling priority is as follows: Handle alarms according to the priorities of equipment alarms (such as BUS_ERR, HARD_ERR, and COMM_FAIL), optical-layer LOS, electrical-layer OTUk_LOF, ODUk_SSF, and protection switching.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 31
Which of the following monitoring boards do not support the processing and transparent transmission of 1588V2 signals? (Multiple choice)

  • A. ST2
  • B. SC2
  • C. SC1
  • D. AST2

Answer: B,C

 

NEW QUESTION 32
The following description of the cross-board of the OSN 8800 T64 subrack. Which is correct? (Multiple choice)

  • A. Enhanced subrack can only be configured with UXCT+USXM or UXCT+USXH
  • B. XCT+SXM can support ODU0, 1, 2, and 3 levels of crossover.
  • C. XCT+SXM can be used together to provide an ODUK crossover with a total capacity of 2.56 Tbit/s.
  • D. XCT+SXM can be regarded as a whole when working. If any faulty, the two boards will be switched together.

Answer: A,B,C,D

 

NEW QUESTION 33
Which of the following description of the single station commissioning is wrong?

  • A. If the input voltage of the equipment is not within the required range, suggestions for rectification should be proposed.
  • B. In case of power failure, the contact board can be used without anti-static wrist or anti-static gloves.
  • C. Single station hardware check is complete, make sure all power switches are in the off position
  • D. It is strictly forbidden to plug and unplug the power plug and PIU board.

Answer: B

 

NEW QUESTION 34
The E&M signal defines the type of connection between a relay device and a signaling unit. Which of the following belongs to the relay device?

  • A. Telecommunications Exchange
  • B. E&M voice exchange
  • C. Softswitch platform
  • D. PBX

Answer: D

 

NEW QUESTION 35
Which of the following alarms trigger optical line protection switching?

  • A. POWER_DIFF_OVER
  • B. R_LOS
  • C. MUT_LOS
  • D. R_LOF

Answer: B

 

NEW QUESTION 36
When creating an electric layer path, one RX/TX port can only establish a connection with one optical channel of the clientLP port.

  • A. TRUE
  • B. FALSE

Answer: B

 

NEW QUESTION 37
Which of the following is the data that needs to be collected and saved in the event of a failure? (Multiple Choice)

  • A. Operation log of the network management
  • B. Equipment alarms and performance events
  • C. Running status data of the NE and the board
  • D. Configuration data of the NE and the board

Answer: A,B,C,D

 

NEW QUESTION 38
The ROADM site using WSMD9 board can support up to 9 dimensions. If it exceeds 9 dimensions, it can be implemented by cascading WSMD9 boards.

  • A. TRUE
  • B. FALSE

Answer: A

 