Real E_S4HCON2023 Dumps - SAP Correct Answers updated on 2023 [Q39-Q59]

Share

Use Real E_S4HCON2023 Dumps - SAP Correct Answers updated on 2023

SAP Certified Technology Specialist E_S4HCON2023 Exam Practice Dumps

NEW QUESTION # 39
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Keep archiving on during the whole procedure.
  • B. Use the Near Zero Downtime Maintenance Technology (NZDM).
  • C. Reuse a profile for the shadow instance from a previous run.
  • D. Choose the instance number of the shadow instance.

Answer: C,D


NEW QUESTION # 40
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

  • A. Database migration
  • B. Custom code analysis
  • C. Unicode conversion
  • D. Software update

Answer: A,D


NEW QUESTION # 41
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

  • A. The SAP support packages that will be bound to the conversion
  • B. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
  • C. The SAP support packages of the support package stack, calculated by the maintenance planner
  • D. The SAP support packages in the download directory that are newer than the selected support package stack

Answer: D


NEW QUESTION # 42
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • B. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • C. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
    &UC) procedure.
  • D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Answer: A


NEW QUESTION # 43
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

  • A. When performing an SAP S/4HANA conversion with DMO
  • B. When performing an SAP S/4HANA conversion without u DMO
  • C. When upgrading an SAP ECC system with DMO
  • D. When upgrading an SAP S/4HANA Server system

Answer: C,D


NEW QUESTION # 44
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Uptime migration (EU_CLONE_MIG_UT_RUN)
  • B. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • C. ParaUel distribution (PARDIST_SHD)
  • D. Shadow repository creation (EU_IMPORT*)

Answer: A


NEW QUESTION # 45
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • B. By searching for transport requests named <SID>K0<number>
  • C. By searching for transport requests in the file umodauto.Ist
  • D. By searching for transport requests that are assigned to the project SAP_ADJUST

Answer: C


NEW QUESTION # 46
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:

  • A. Move the R3trans update archive into the download folder
  • B. Move the SAPM update archive into the download folder
  • C. Move the stack.xml update file into the download folder
  • D. Extract the SAP HANA client installation archive
  • E. Extract the SAP HANA database installation archive

Answer: B,C,D


NEW QUESTION # 47
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It contains a section "free space requirements"
  • B. It contains a troubleshooting section
  • C. It is target release specific
  • D. It is a database-specific document

Answer: A,C


NEW QUESTION # 48
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In SUM Phaselist
  • B. In Process Control Center
  • C. In SUM Parameters
  • D. In DMO Migration Preparation

Answer: B,C


NEW QUESTION # 49
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for running R3trans processes on the host of the primary application server
  • B. Check for running R31oad processes on the host of the primary application server
  • C. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • D. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Answer: A,D


NEW QUESTION # 50
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. The repository is migrated in uptime
  • B. TABIMJJPG is executed in uptime
  • C. An additional temporary database is used during uptime
  • D. Dedicated application tables are migrated in uptime

Answer: D


NEW QUESTION # 51
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Windows, SAP HANA
  • B. Kernel for target release, Linux, SAP HANA
  • C. Kernel for target release, Windows, SAP MaxDB
  • D. Kernel for source release, Windows, SAP MaxDB

Answer: A,D


NEW QUESTION # 52
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The repetition option allows you to repeat the complete migration
  • B. The benchmaking option allows you to repeat the uptime migration
  • C. The repetition option allows you to run the migration without a shadow system
  • D. The benchmaking option allows you to migration a specified set of tables

Answer: D


NEW QUESTION # 53
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?

  • A. The SAP S/4HANA Conversion is without DMO.
  • B. The start release is too old for DOC.
  • C. The source database is not supported
  • D. The SAP S/4HANA Conversion includes a DMO.

Answer: C


NEW QUESTION # 54
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The Application Guide
  • B. The major SUM Guide
  • C. The DMO Guide
  • D. The SAP S/HANA Conversion Guide

Answer: C,D


NEW QUESTION # 55
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

  • A. Downtime Optimized Data Conversion (DoC)
  • B. Near-Zero Downtime Maintenance (nZDM)
  • C. Near-Zero Downtime Technology (NZDT)
  • D. Downtime Optimized DMO (DoDMO)

Answer: C


NEW QUESTION # 56
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Switch to new repository (EU_SWITCH)
  • B. Modification adjustment (SPDD)
  • C. Activation of dictionary objects (ACT_UPG)
  • D. Conversion of application tables (PARCONVJJPG)

Answer: B,C


NEW QUESTION # 57
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support Packages contained in the upgrade media
  • B. The SAP Support Packages that will be bound to the upgrade
  • C. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • D. The SAP Support Packages found in the download directory

Answer: D


NEW QUESTION # 58
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP S/4HANA Server 1809 and above
  • B. SAP ECC system from SAP ERP 6.0 EHP 8
  • C. Standalone AS ABAP with SAP_BASIS 752 and above
  • D. SAP Solution Manager 7.2

Answer: A,C


NEW QUESTION # 59
......

Get ready to pass the E_S4HCON2023 Exam right now using our SAP Certified Technology Specialist Exam Package: https://www.actualpdf.com/E_S4HCON2023_exam-dumps.html

E_S4HCON2023 Premium Files Test pdf - Free Dumps Collection: https://drive.google.com/open?id=1Y2-QYWsepR9lT3_Xk6EzjKHlDKvKmyz6