HP HPE0-S22 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Given a scenario, determine the customer's IT maturity and recommend next steps
  • Determine an approach to address customers' business requirements
Topic 2
  • Explain how the four HPE Transformation Areas relate to a given server solutions
  • Determine optimal processors for specific use cases and operational workloads
Topic 3
  • Given a customer's storage infrastructure (e.g., iSCSI, Fibre, NAS, DAS)
  • Foundational server architectures and technologies
Topic 4
  • Given a customer's networking infrastructure determine an appropriate configuration for server deployment
  • Planning and designing HPE server solutions
Topic 5
  • Differentiate and position the HPE server product offerings, architectures, and options
  • Explain the functions and benefits of HPE health and fault technologies
Topic 6
  • Functions, features, and benefits of HPE server products and solutions
  • Given an anticipated performance bottleneck, determine an appropriate design solution
Topic 7
  • Given a scenario with changed customer requirements, recommend modifications to the implementation plan
  • Analyzing the server market and positioning HPE server solutions to customers
Topic 8
  • Determine customer’s internal/external storage capacity and performance requirements


How can you begin study for the HPE Master ASE - Server Solutions Architect (HPE0-S22) Certification Exam

Best guide For HPE Master ASE - Server Solutions Architect (HPE0-S22) Certification Exam

Quick preparation guide if you don’t have time to read complete the page

This exam validates candidates' knowledge and skills on the advanced architecture of HPE server products and solutions. This exam also tests the knowledge of Candidate advanced server architectures and associated technologies, as well as their features, characteristics, and benefits. Moreover, it also verifies knowledge to analyzing the server market, positioning HPE server solutions with customers, demonstrating business information about the server, and the relationship between HPE transformation areas and HPE products and server solutions.

NEW QUESTION 23
An architect is planning an HPE Moonshot System deployment. The architect plans to individually connect each iLO CM module to the management network. The customer informs the architect that this plan requires too many 1GbE ports per rack for the data center infrastructure.
What is one way that the architect can alter the plan to meet the customer's needs, while still allowing iLO access to the HPE Moonshot Systems?

  • A. Keep one iLO CM Management port connected to the network. Use the iLO CM link ports on each iLO CM module to daisy chain the chassis together.
  • B. Enable the iLO REST API on each cartridge node. The nodes will then accept iLO commands on the adapters that they use for production traffic.
  • C. Add a second switch module and uplink module to each chassis to connect to the cartridge iLO ports. Stack the modules in different chassis and connect just one to the management network.
  • D. Configure iLO traffic to share the same adapters as production traffic. Configure VLANs on the HPE Moonshot switch modules to separate the two types of traffic.

Answer: C

 

NEW QUESTION 24
An architect takes the following notes during a meeting with a customer:
Which solution should the architect propose to help the customer overcome all of its project challenges?

  • A. HPE Apollo 2000 solution with HPE 3PAR storage
  • B. HPE ConvergedSystem 700 solution with HPE 3PAR storage
  • C. HPE Apollo 6000 solution with HPE 3PAR storage
  • D. HPE BladeSystem solution with HPE 3PAR storage

Answer: C

 

NEW QUESTION 25
A customer plans to use Insight Control server provisioning and HPE OneView for vCenter
Server. The vCenter Server manages one c7000 enclosure with 16 server blades running
VMware ESXI.
Which licensing option should the architect include in the proposal?

  • A. one HPE OneView Standard license for each managed server and one HPE OneView for vCenter Server license for the c7000 enclosure
  • B. one Insight Control server provisioning license for each managed server
  • C. one HPE OneView Advanced license for each managed server
  • D. one Insight Control server provisioning license for each managed server blade and one
    HPE OneView for vCenter Server license for the entire c7000 enclosure

Answer: D

 

NEW QUESTION 26
A customer's business critical application server, which is managed by HPE OneView, recovered from an automatic ASR reboot. HPE Support requests an Active Health System log.
What should the customer use to access the log while the server is online?

  • A. Intelligent Provisioning
  • B. iLO
  • C. HPE OneView
  • D. UEFI Bios

Answer: B

 

NEW QUESTION 27
An architect is planning an HPE Moonshot System to host a customer Hadoop MapReduce2 application. The architect originally proposed the following:
* m710 cartridges
* HPE 45XGc switches
* HPE 4-QSFP+ Uplink Modules
The customer now needs each HPE Moonshot chassis to provide at least 1TB of memory and 40TB or local storage.
Cartridge nodes needs two 10GbE ports each.
What does the architect need to replace in the solution to meet the customer's new requirements?

  • A. 4-QSFP+ Uplink Modules with 16-SFP+ Uplink Modules, which provide 10GbE ports to the cartridges
  • B. m710 cartridges with m710p cartridges, which support higher capacity local drives
  • C. 45XGc switches with 180G switches, which provide the required two 10GbE ports to the cartridges
  • D. m710 cartridges with m350 Cartridge, which provide more memory

Answer: A

Explanation:
Explanation

 

NEW QUESTION 28
Which of the HPE Transformation Areas should the architect discuss when the customer's concerns span backup and recovery, high availability, and disaster recovery?

  • A. Enable workplace productivity.
  • B. Protect the digital enterprise.
  • C. Transform to a hybrid infrastructure.
  • D. Empower the data-driven organization.

Answer: B

Explanation:
Explanation/Reference: https://community.hpe.com/t5/OEM-Solutions/Transformation-Areas-for-the-New-Style-of- Business/ba-p/6830963#.WQA-_Fi6wSw

 

NEW QUESTION 29
What is a basic assumption for an architect using the HPE Servers TCO calculator to justify a customer's migration away from a fully depreciated set of hardware?

  • A. The Net Present Value (NPV) is the difference between the value of the older systems and the cost of the new systems.
  • B. By analyzing the project's internal rate of return (IRR), it is possible to determine if the lower IRR will make it more desirable to undertake the project.
  • C. The opportunity costs of not migrating from a legacy environment to an HPE Converged
    Infrastructure Solution, in terms of IT Efficiency and User Productivity, will always justify the purchase.
  • D. When the customer's older systems are under a support contract, a new system can sometimes pay for itself simply by not renewing the older support contracts.

Answer: A

 

NEW QUESTION 30
When designing a Superdome X configuration for a customer, which storage configuration should the architect choose?

  • A. one mezzanine FC port on one nPar dedicated for booting from an MSA 2040 and an additional FC port for user data
  • B. booting from a local direct attached SSD disk and a mezzanine TOE N/W port for user data accessing an MSA 2040 using iSCSI
  • C. booting from a local direct attached SSD disk and a mezzanine FC port for user data storage on an MSA 2040
  • D. a single mezzanine FC port in each nPar for common access to all volumes on an HPE
    3PAR StoreServ

Answer: D

 

NEW QUESTION 31
A customer needs an HPE Apollo 6000 solution and Remote Direct Memory Access (RDMA).
Which network interconnects should the architect recommend for this solution? (Choose two.)

  • A. 16 Gb Fibre Channel
  • B. Infiniband
  • C. 1 GbEthernet
  • D. FlexFabric
  • E. 12G SAS

Answer: B,D

 

NEW QUESTION 32
Which statement describes the availability metrics for an HPE system's high availability?

  • A. A system with an availability of 99.99% can be expected to be in operational for 6 minutes or fewer per year.
  • B. All standard HPE servers are designed for 99.9999% availability.
  • C. A system with an availability of 99.999% will statistically not have an unscheduled downtime of more than 1 hour total in 10 years of operation.
  • D. A system consisting of HPE standard servers with an availability of 99.9999% and a storage system with an availability of 99.99% will have a combined availability of
    99.99999%.

Answer: D

 

NEW QUESTION 33
During a data center transformation discussion, an architect obtains the following customer information:
core business depends heavily on advanced data modelling techniques that has been developed

internally
infrastructure in use takes anywhere from 10 hours to five days to complete complex data models for

the various development teams that rely on them
has a proud reputation as an "environmentally friendly" Fortune 500 company

increasing productivity of its development team is the highest priority

Which large scale HPC solution should the architect recommend to help the customer achieve its transformation goals?

  • A. HPE Integrity Superdome X
  • B. HPE Apollo 2000
  • C. HPE Apollo 6000
  • D. HPE Apollo 8000

Answer: B

 

NEW QUESTION 34
When designing a Superdome X configuration for a customer, which storage configuration should the architect choose?

  • A. one mezzanine FC port on one nPar dedicated for booting from an MSA 2040 and an additional FC port for user data
  • B. booting from a local direct attached SSD disk and a mezzanine TOE N/W port for user data accessing an MSA 2040 using iSCSI
  • C. booting from a local direct attached SSD disk and a mezzanine FC port for user data storage on an MSA 2040
  • D. a single mezzanine FC port in each nPar for common access to all volumes on an HPE
    3PAR StoreServ

Answer: D

 

NEW QUESTION 35
How does the HPE c7000 BladeSystems use of network infrastructure compare with the HPE Apollo
6000's?

  • A. The HPE Apollo 6000 uses fewer network ports per server.
  • B. The HPE c7000 BladeSystem offers less port variety.
  • C. The HPE Apollo 6000 offers greater per server connectivity.
  • D. The HPE c7000 BladeSystem offers greater port consolidation.

Answer: B

 

NEW QUESTION 36
A customer has a large Oracle-based ERP solution that runs on HPUX and multiple rx2800 i2 servers. The customer plans to move to an open source solution to reduce operating expenses. The customer needs the ability to deliver incremental capacity and needs to avoid incremental Oracle licensing costs.
Which HPE Server solution will help meet the customer's needs?

  • A. HPE Apollo 4500 System
  • B. HPE BladeSystem c7000 with BL460GGen9 Servers
  • C. HPE Superdome X
  • D. HPE Apollo 6000 System

Answer: C

 

NEW QUESTION 37
A proposed solution includes the HPE Moonshot-4QSFP+ Uplink Modules. The customer informs the architect that the planned purchase of 40GbE switches has been postponed. The customer still intends to purchase 40GbE switches within a year, but in the meantime, existing 10GbE switches will be used. These switches are HPE network switches located 25 meters from the location of the racks that house the HPE Moonshot Solution. The customer needs 30Gb/s bandwidth.
Which action should the architect recommend to allow the customer to deploy the solution immediately and easily take advantage of 40GbE when deployed later?

  • A. Swap in HPE Moonshot-16SFP+ Uplink Modules
  • B. Replace the QSFP+ transceivers with SFP+ transceivers
  • C. Add QSP+/SFP+ adaptor kits to the design
  • D. Replace the DAC cables with DAC splitter cables

Answer: C

 

NEW QUESTION 38
An architect is proposing a solution that has two HPE Moonshot 1500 chassis, each of which is full of m700 cartridges. The customer needs the solution to quickly deploy the OS to cartridges, back up a golden node image. and clone the image.
The customer is concerned about cost and is not interested in managing or monitoring performance of the solution, Which solution meets these requirements?

  • A. HPE Intelligent Provisioning (IP)
  • B. HPE Insight Cluster Management Utility (CMU)
  • C. HPE OneView 2.0
  • D. HPE Insight Control server provisioning (ICsp)

Answer: B

Explanation:
Explanation/Reference:
Reference: https://www.google.com/url?
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwjU36a30sHTAhVJShQKHSt0 BhYQFggnMAA&url=http%3A%2F%2Fwww.hpe.com%2Fsupport%
2Fmoonshot_os_deployment_en&usg=AFQjCNHzc8octr9gtYrHDWIERZNfWTSoEw&sig2=ITJAdGidDUO SlN-6u7QKeQ

 

NEW QUESTION 39
......

Pass Your HPE0-S22 Exam Easily With 100% Exam Passing Guarantee: https://www.actualpdf.com/HPE0-S22_exam-dumps.html