NEW QUESTION 61
Which of the following structural elements does a process order have? (Choose three.)
- A. Parallel sequences
- B. Characteristic-based process instructions
- C. Relationships
- D. Phases
- E. Item data
Answer: B,C,D
NEW QUESTION 62
Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order?
- A. An availability check by means of ATP creates fixed links between customer orders and their confirmed receipts.
- B. The ATP quantity is the quantity still available that can be used to confirm incoming customer orders.
- C. If the ATP check establishes non-availability, it checks whether it is still possible to procure or produce in time.
- D. The ATP check does not confirm against stocks and receipts, it checks consumption against planning requirements.
Answer: B
NEW QUESTION 63
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)
- A. Standard value from operation in task list
- B. User-defined field from operation in task list
- C. General values from work scheduling view in the material master
- D. General item values in bill of materials
- E. General operation values in task list
Answer: A,B,E
NEW QUESTION 64
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default.
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
- A. The planning horizon is set in the MRP groups in Customizing and the variant values are stored in the material masters for the materials in question.
- B. The planning horizon is set in the plant parameters in Customizing and variant entries are stored in the material masters for the materials in question.
- C. The planning horizon is set in the MRP groups in Customizing and variant entries are assigned via the plant parameter settings.
- D. The planning horizon is set in Customizing using the plant parameter setting and variant entries are assigned via the MRP groups for the materials in question.
Answer: D
NEW QUESTION 65
Which of the following properties applies to multi-site planning in SAP ECC?
- A. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
- B. Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.
- C. The use of "scope of planning" is always mandatory for multi-site planning.
- D. Multi-site planning can be activated using the corresponding planning strategy.
Answer: B
NEW QUESTION 66
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
- A. Assign an appropriate availability checking rule to the material master for the product.
- B. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
- C. Activate the availability check and assign an overall profile in the production scheduling profile.
- D. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.
Answer: D
NEW QUESTION 67
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)
- A. Material directory
- B. Pull list
- C. Pick list
- D. Logistics Information System (LIS)
- E. Automatic generation of a transport order
Answer: B,C,E
NEW QUESTION 68
When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two)
- A. At the plant level
- B. At the business area level
- C. At the client level
- D. At the company code level
Answer: A,C
NEW QUESTION 69
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)
- A. Resource selection
- B. Approved master recipes
- C. Availability check
- D. Electronic batch record
- E. Digital signature
Answer: B,D,E
NEW QUESTION 70
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)
- A. A planning algorithm from capacity planning
- B. Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)
- C. Manual assignment of planned production quantities in a planning table
- D. Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting
- E. Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP)
Answer: C,D,E
NEW QUESTION 71
In which of the following objects can you activate back flushing for production orders? (Choose three)
- A. Work center
- B. Routing
- C. Material master (finished product)
- D. Production scheduling profile
- E. Material master (component)
Answer: A,B,E
NEW QUESTION 72
In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?
- A. In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.
- B. Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.
- C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- D. Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.
Answer: A
NEW QUESTION 73
Which Customizing element controls the determination of planned costs in production orders?
- A. Costing variant
- B. Accounting type
- C. Settlement profile
- D. Calculation procedure
Answer: A
NEW QUESTION 74
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
- A. Subcontracting is supported by MRP areas.
- B. Make-to-order production is supported by storage location MRP areas.
- C. An MRP area may include different storage locations.
- D. A storage location may be assigned to different MRP areas.
Answer: A,C
NEW QUESTION 75
Which of the following master data can be used with process orders? (Choose three)
- A. Resources
- B. Production/resource tools
- C. Master recipes
- D. Serial numbers
- E. Production versions
Answer: A,C,E
NEW QUESTION 76
What could be a consequence of confirming an operation?
- A. The capacity requirements are updated
- B. The production order is rescheduled
- C. The planned costs are updated
- D. The actual costs are settled
Answer: A
NEW QUESTION 77
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB).
The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?
- A. There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.
- B. Create a new material with a reference to the original material and assign the metric unit of measure to the new material master.
- C. Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1.
- D. Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.
Answer: A
NEW QUESTION 78
Which of the following statements about the SAP Solution Manager listed is correct?
- A. Solution Manager is an add-on industry solution.
- B. Solution Manager is a stand-alone system that communicates with other systems in a system landscape.
- C. Solution Manager is a satellite system in a system landscape.
- D. Solution Manager is part of the SAP ECC System.
Answer: B
NEW QUESTION 79
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)
- A. Operation control key (routing)
- B. Standard values (routing)
- C. Transport time (routing)
- D. Formulas (work center)
- E. In-house production time (material master)
Answer: A,B,D
NEW QUESTION 80
Which of the following elements can be used in a process order? (Choose three)
- A. Process instructions
- B. Parallel sequences
- C. Suboperations
- D. Relationships
- E. Phases
Answer: A,D,E
NEW QUESTION 81
......
SAP C-TSCM42-67 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
SAP C-TSCM42-67 Exam Description:
The certification "SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7" verifies the knowledge in the area of Production for the consultant profile. This certificate proves that the candidate has a basic understanding within this consultant profile and can implement this knowledge practically in projects. The SAP Certified Application Associate can contribute to the success of the planning and implementation phases of the project in a mentored role and would typically have a maximum of three years experience in the solution area. Project experience should not be prerequisite for a competent and well trained candidate to pass this exam.
SAP C-TSCM42-67 Real 2021 Braindumps Mock Exam Dumps: https://www.actualpdf.com/C-TSCM42-67_exam-dumps.html