NCARB Project-Planning-Design Exam Overview:
| Certification Vendor: | NCARB |
|---|---|
| Exam Name: | Project Planning & Design (PPD) |
| Exam Number: | ARE 5.0 PPD |
| Exam Duration: | 235 minutes |
| Exam Format: | Hotspot, Case studies, Multiple choice, Drag and drop, Multiple response |
| Real Exam Qty: | Approx. 85–100+ (including case studies) |
| Available Languages: | English |
| Related Certifications: | ARE 5.0 Programming & Analysis (PA) ARE 5.0 Construction & Evaluation (CE) ARE 5.0 Practice Management (PcM) ARE 5.0 Project Development & Documentation (PDD) ARE 5.0 Project Management (PjM) |
| Certificate Validity Period: | 5-year rolling clock for completion of all ARE divisions |
| Passing Score: | 550 (scaled score) |
| Exam Price: | USD 235 per division (subject to NCARB updates) |
| Recommended Training: | Amber Book ARE Prep NCARB ARE 5.0 Guidelines & Handbook Black Spectacles ARE Prep |
| Exam Registration: | Prometric Scheduling (NCARB exams) NCARB Exam Registration Portal |
| Sample Questions: | ![]() |
| Exam Way: | Computer-based testing at authorized test centers or online proctored delivery (where available) |
| Pre Condition: | No formal prerequisite, but candidates typically pursue after completing architecture education requirements for licensure eligibility |
| Official Syllabus URL: | https://www.ncarb.org/exams/are/are-5.0 |
NCARB Project-Planning-Design Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Environmental Conditions & Context | Approx. 25–30% | - Site analysis and environmental factors
|
| Project Integration of Program and Systems | Approx. 10–15% | - Program development
|
| Building Systems, Materials, and Assemblies | Approx. 30–35% | - Mechanical, electrical, and plumbing systems
|
| Codes & Regulations | Approx. 25–30% | - Building codes and standards
|
NCARB Project-Planning-Design Exam: FAQ for Serious Candidates
NCARB ARE 5.0 Project Planning & Design (PPD) is an official NCARB exam, listed under exam code Project-Planning-Design. A passing result earns you the Architect Registration Examination (ARE 5.0) certification at the Professional level. It also ties into ARE 5.0 Practice Management (PcM), ARE 5.0 Project Management (PjM), ARE 5.0 Programming & Analysis (PA), ARE 5.0 Project Development & Documentation (PDD), ARE 5.0 Construction & Evaluation (CE), extending its value across your certification roadmap. Employers read this credential as verified competence, which is why it keeps appearing in job requirements.
Expect Approx. 85–100+ (including case studies) questions inside 235 minutes on the NCARB ARE 5.0 Project Planning & Design (PPD) exam. That pace punishes hesitation, so rehearse it: the ActualPDF software engine simulates the real exam scene, reminds you of the questions you got wrong, and pushes you to re-practice them until the clock stops being your enemy.
Passing NCARB ARE 5.0 Project Planning & Design (PPD) requires 550 (scaled score), and the official registration fee is USD 235 per division (subject to NCARB updates). Retakes charge the full USD 235 per division (subject to NCARB updates) again, which is why experienced candidates treat preparation as the cheaper exam fee. Verify your readiness with repeated ActualPDF practice scores above the requirement before you commit to a date.
No formal prerequisite, but candidates typically pursue after completing architecture education requirements for licensure eligibility
Requirements evolve, so confirm the current conditions before registering on the official exam page.
Registration for NCARB ARE 5.0 Project Planning & Design (PPD) goes through the official channels listed here.
When you schedule, note that the exam is delivered Computer-based testing at authorized test centers or online proctored delivery (where available).
NCARB recommends the following training for NCARB ARE 5.0 Project Planning & Design (PPD) candidates.
Follow any course with the 102 practice questions in the ActualPDF Project-Planning-Design package; the software engine will even remind you which mistakes need another round.
Yes. ActualPDF provides a free download demo of the NCARB ARE 5.0 Project Planning & Design (PPD) material, so you can check the content before choosing a version. After purchase, a one-year warranty covers you: the latest version is sent to you as it releases, free for 365 days, and after expiry you can extend the update service at a 50% discount.
Your purchase is covered by a 100% money-back guarantee with clear conditions. Take the NCARB ARE 5.0 Project Planning & Design (PPD) exam within 60 days of purchase; if you fail, provide your unqualified result by submitting a scanned enrollment slip and the official Score Report PDF within 2 days of the exam, and the full refund is processed within 7 days. The exam must match your product, candidate and payer names must match, and attempts within 3 days of purchase, unused downloads, free materials, and expired orders are not covered. Alternatively, exchange for two other exam products of equal value, free, or wait for updates while keeping your original product's update service.
Delivery is instant: files unlock for download at payment and are emailed within one minute. If nothing arrives within 2 hours, check spam and contact customer service, which works 7/24 and normally replies within two hours. Installation is unlimited across your computers.
The NCARB ARE 5.0 Project Planning & Design (PPD) syllabus spans 4 domains, led by Project Integration of Program and Systems (Approx. 10–15%), Codes & Regulations (Approx. 25–30%), and Building Systems, Materials, and Assemblies (Approx. 30–35%). The complete topic list is published above; candidates who study the map first rarely get lost later.
NCARB ARE 5.0 Project Planning & Design (PPD) Sample Questions:
Which of the following types of heating system would be appropriate when the design requires a very compact system that has a low initial cost, is easily zoned, and has a quick response to temperature changes?
- A. Combination forced air/hydronic
- B. Electric
- C. Hydronic
- D. Forced air
Correct Answer: B 🗳️
Explanation: Only visible for ActualPDF members. You can sign-up / login (it's free).
An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces, administrative spaces and public/lobby spaces.
The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.
The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The building entrance faces northwest, convenient to the parking but not visible from the highway.
The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would include a second building (2 story, 80,000 BGSF) and/or a parking deck.
Other considerations for the project include:
* Protected tree requirements are defined in the PD document.
* Easy pedestrian access must be provided from Sycamore Boulevard.
* All required parking for the clinic must be accommodated on site.
* Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).
* Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.
* All service equipment needs to be screened; see PD document for restrictions.
* Signage opportunities are important to the client.
* Acoustical privacy is a concern of the healthcare system.
The following resources are available for your reference:
* Drawings, including a perspective, plans, and exterior elevations
* Building Program, including client's departmental program and detailed program for Treatment 01 (Infusion)
* Exterior Material Cost Comparisons
* Planned Development Document
* IBC Excerpts, showing relevant code sections
* ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design The owner is considering fitting out part of the shell space on the third floor as a cafeteria with tables and chairs and a 1,000-square-foot kitchen. The architect notes that the aggregate occupant load is 325 for the spaces already planned for the third floor and the proposed kitchen.
What is the net area that can be allocated to the cafeteria before a third exit stair is needed from the third floor?
- A. 4,875 square feet
- B. 2,625 square feet
- C. 1,225 square feet
Correct Answer: B 🗳️
Explanation: Only visible for ActualPDF members. You can sign-up / login (it's free).
During design development of a new college laboratory facility, the owner asks the architect to include way- finding signage mounted adjacent to doors. The type of signage requested will project into the corridors of the building.
Which of the following should the architect consider when selecting the signage? Check the three that apply.
- A. Manufacturer installation information
- B. IBC exit width requirements
- C. International Energy Code
- D. ADA accessibility requirements
- E. Signage material and finish type
- F. Local zoning ordinance on signage
Correct Answer: A,B,D 🗳️
Explanation: Only visible for ActualPDF members. You can sign-up / login (it's free).
An architect is selecting a mechanical system for the first floor of a hotel in a temperate climate. They must consider the following:
* The building footprint covers 95% of the small urban site.
* The first floor has an open floor plan that includes a lobby, bar, and restaurant.
* The plan can only accommodate one 500 sf mechanical room.
What mechanical system should the architect recommend?
- A. Geothermal heat pump
- B. Variable refrigerant flow system
- C. Packaged terminal air conditioners
Correct Answer: B 🗳️
Explanation: Only visible for ActualPDF members. You can sign-up / login (it's free).
Refer to the exhibit (residential floor plan with three outlined elevator core locations A, B, C).
During design development, an owner has chosen an elevator that does not fit in the location previously selected for the two-car elevator core. The elevator core should be near the main entrance lobby and centrally located. The minimum program requirements for each residential floor are the following:
One bicycle room
Five studios
Five 1-bed units
Eight 2-bed units
Three 3-bed units
Which outlined location meets the requirements?
- A. A
- B. C
- C. B
Correct Answer: B 🗳️