The CCP exam fee is expensive enough once; a third sitting is a budget category nobody wants. ActualPDF built its 189 AACE International Certified Cost Professional (CCP) practice questions so your preparation costs less than a single retake.
AACE International CCP Exam Overview:
| Certification Vendor: | AACE International |
|---|---|
| Exam Name: | AACE International Certified Cost Professional (CCP) Examination |
| Exam Number: | CCP |
| Related Certifications: | Earned Value Professional (EVP) Planning & Scheduling Professional (PSP) |
| Available Languages: | English |
| Exam Format: | Multiple Choice |
| Recommended Training: | AACE International CCP Certification Preparation Resources |
| Exam Registration: | AACE International Certification Information |
| Sample Questions: | ![]() |
| Exam Way: | Computer-based exam at authorized test centers or proctored online (varies by region and provider arrangement). |
| Pre Condition: | Relevant experience in cost engineering, project controls, or related disciplines is typically required by AACE International for CCP certification eligibility. |
| Official Syllabus URL: | https://www.aacei.org |
AACE International CCP Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: Cost Engineering Foundations | - Cost engineering principles - Project cost management fundamentals |
| Topic 2: Cost Estimating | - Conceptual and detailed estimating - Estimate classification and accuracy |
| Topic 3: Project Control and Performance Measurement | - Performance measurement and forecasting - Earned value management (EVM) |
| Topic 4: Project Management Integration | - Project execution and control processes - Contract and procurement considerations |
| Topic 5: Planning and Scheduling | - Work breakdown structure (WBS) - Critical path method (CPM) |
| Topic 6: Risk and Uncertainty Management | - Risk identification and analysis - Contingency and mitigation planning |
Questions and Answers About AACE International Certified Cost Professional (CCP)
AACE International Certified Cost Professional (CCP) is an official AACE International exam, listed under exam code CCP. A passing result earns you the Certified Cost Professional (CCP) certification at the Professional level. It also ties into Planning & Scheduling Professional (PSP), Earned Value Professional (EVP), extending its value across your certification roadmap. Employers read this credential as verified competence, which is why it keeps appearing in job requirements.
Relevant experience in cost engineering, project controls, or related disciplines is typically required by AACE International for CCP certification eligibility.
Requirements evolve, so confirm the current conditions before registering on the official exam page.
Registration for AACE International Certified Cost Professional (CCP) goes through the official channels listed here.
When you schedule, note that the exam is delivered Computer-based exam at authorized test centers or proctored online (varies by region and provider arrangement)..
AACE International recommends the following training for AACE International Certified Cost Professional (CCP) candidates.
Follow any course with the 189 practice questions in the ActualPDF CCP package; the software engine will even remind you which mistakes need another round.
Yes. ActualPDF provides a free download demo of the AACE International Certified Cost Professional (CCP) material, so you can check the content before choosing a version. After purchase, a one-year warranty covers you: the latest version is sent to you as it releases, free for 365 days, and after expiry you can extend the update service at a 50% discount.
Your purchase is covered by a 100% money-back guarantee with clear conditions. Take the AACE International Certified Cost Professional (CCP) exam within 60 days of purchase; if you fail, provide your unqualified result by submitting a scanned enrollment slip and the official Score Report PDF within 2 days of the exam, and the full refund is processed within 7 days. The exam must match your product, candidate and payer names must match, and attempts within 3 days of purchase, unused downloads, free materials, and expired orders are not covered. Alternatively, exchange for two other exam products of equal value, free, or wait for updates while keeping your original product's update service.
Delivery is instant: files unlock for download at payment and are emailed within one minute. If nothing arrives within 2 hours, check spam and contact customer service, which works 7/24 and normally replies within two hours. Installation is unlimited across your computers.
The AACE International Certified Cost Professional (CCP) syllabus spans 6 domains, led by Project Control and Performance Measurement, Risk and Uncertainty Management, and Project Management Integration. The complete topic list is published above; candidates who study the map first rarely get lost later.
AACE International Certified Cost Professional (CCP) Sample Questions:
Money is value. Having money when you need it is very important. Money can also be valuable when used wisely by knowing when to spend and when to conserve Also, planning now for future expenses can be a plus to the company rather than a debit.
There are several ways to capitalize money and spending. Basically there is the single payment method that has a compound amount factor and a present worth factor. There is the uniform annual series that has a sinking fund factor, capital recovery factor and also the compound amount factor and present worth factor. At this point, we can assure money is worth 10%.
The following question requires your selection of CCC/CCE Scenario 7 (4.8.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
A contractor must purchase a piece of equipment for $150,000. It has an estimated life of 10 years with no salvage value at the end. Ten years from now it will be necessary to purchase another piece of equipment, but this time it will cost $250,000. How much will the contractor need to invest at the end of each year in order to have the right amount?
- A. $16,273
- B. $15,687
- C. $9,412
- D. $12,550
Explanation: Only visible for ActualPDF members. You can sign-up / login (it's free).
The following question requires your selection of CCC/CCE Scenario 6 (2.7.50.1.3) from the right side of your split screen., using the drop down menu, to reference during your response/choice of responses.
What is the range of unit costs?
- A. $26.65
- B. $21.57
- C. $485.00
- D. $48.22
Explanation: Only visible for ActualPDF members. You can sign-up / login (it's free).
The following question requires your selection of CCC/CCE Scenario 28 (3.7.50.1.7) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
In the A relationship, the subcontractor might use an unbalance bid to:
- A. Provides an alternative to competitive bidding
- B. To get more payment early in the job
- C. Decrease the chances of extended claim litigation
- D. Reduce the risk of quantities being greater than estimated
Explanation: Only visible for ActualPDF members. You can sign-up / login (it's free).
The following question requires your selection of CCC/CCE Scenario 28 (3.7.50.1.7) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
If the owner in A has a primary goal of completion within budget, the following contract types with the engineer/contractor would be best:
- A. Engineer - cost plus, contractor cost plus
- B. Engineer fixed price, contactor cost plus
- C. Engineer - cost plus, contractor fixed price
- D. Engineer - fixed price, contractor fixed price
Explanation: Only visible for ActualPDF members. You can sign-up / login (it's free).
After collecting the control information on a light rail project within an original budget of 200.000 work hours, the construction contractor is ready for their monthly progress meeting with the client.
A total of 100.000 work hours have boon scheduled to date. with 105.000 work hours earned, and 110.000 work hours paid. The stated progress by the contractor is 60%.
How does the project stand?
- A. Schedule is bad, cost is bad
- B. Schedule is good cost is good
- C. Schedule is bad cost is good
- D. Schedule is good, cost is bad
Explanation: Only visible for ActualPDF members. You can sign-up / login (it's free).
PDF Version Demo